TOAK, The Thread of All Knowledge Part XIII
Join Date: Jan 2011
Location: Southeast Michigan 15 Minutes East Of Hell
Posts: 149,055
Received 49,731 Likes
on
19,288 Posts
Hah! Cheryl, no ****, suggested an elevator! I just gave her the "are you insane?" look and left it at that. Here's today's progress -
I cut all of the parts necessary to install the stairs today, so now it's a matter of assembling and finishing.
Admittedly, it doesn't look like much. But a lot of planning went into those two stringers.
Last edited by nevada72; 12-05-2019 at 06:12 PM.
Fortunately the drinks are located above the ladder Russ. It's all about the planning.
Join Date: Mar 2014
Location: TOAK Northern Branch
Posts: 34,574
Received 2,084 Likes
on
1,601 Posts
Originally Posted by rwhisen
Have fun Rick!
Way more work than I would have imagined. Then cutting four and getting them to match up perfectly was a challenge. After that was glue, 6 inch lags, and clamps.
Last edited by Juan L; 12-11-2020 at 08:36 PM.
The following 5 users liked this post by iRider:
Imold (12-05-2019),
nevada72 (12-05-2019),
OKMICK (12-05-2019),
soft 02 (12-05-2019),
Uncle Larry (12-05-2019)
Join Date: Mar 2014
Location: TOAK Northern Branch
Posts: 34,574
Received 2,084 Likes
on
1,601 Posts
Join Date: Jan 2011
Location: Southeast Michigan 15 Minutes East Of Hell
Posts: 149,055
Received 49,731 Likes
on
19,288 Posts