What did you do to Your Softail Today?
#8681
#8682
The following users liked this post:
soldierbot (03-14-2020)
#8684
Installed a new Trask Assault air cleaner. I always liked these, but the price was just too high. Found a new one on eBay at a decent price and grabbed it. I did not want to spend another $100 on an external breather, so I filled the internal breather passage and drilled out some grease fittings and installed. Then I ran some rubber lines to a T- fitting and vented to my swing arm. Really like this air cleaner - real nice quality.
The following 9 users liked this post by txphatboy:
'03fattyNC (03-20-2020),
09fitz (03-16-2020),
back again (03-21-2020),
BikerPepe` (03-14-2020),
Innigray (03-18-2020),
and 4 others liked this post.
#8685
Storage rehab
I am in the process bringing to life my newly aquired 93 fxstc. So far I've drained the tank andrebuilt and rejetted the stock cv carb. Had two new Metzlers installed on the rims and balanced at my local Harley shop. Removed inner and outer primary to change the drive belt and rear brake pads plus rebuild the rear caliper. Changed the engine oil and filter (before tearing the primary's off). Purchased a Vance and Hines street 2 into one pipe. Installed new poly handle bar isolation mounts. Done hours of chrome refurbishing. Assembly of the primary's is next and then I should be close to tagging it. Any definite things other than usual service that should be looked at. Also changing trans fluid as well.
The following users liked this post:
soldierbot (03-25-2020)
#8686
#8687
Join Date: Jan 2019
Location: Mostly Florida, some Michigan
Posts: 2,779
Received 1,930 Likes
on
973 Posts
I am in the process bringing to life my newly aquired 93 fxstc. So far I've drained the tank andrebuilt and rejetted the stock cv carb. Had two new Metzlers installed on the rims and balanced at my local Harley shop. Removed inner and outer primary to change the drive belt and rear brake pads plus rebuild the rear caliper. Changed the engine oil and filter (before tearing the primary's off). Purchased a Vance and Hines street 2 into one pipe. Installed new poly handle bar isolation mounts. Done hours of chrome refurbishing. Assembly of the primary's is next and then I should be close to tagging it. Any definite things other than usual service that should be looked at. Also changing trans fluid as well.
#8689
#8690
The following 3 users liked this post by SanJuanRon: