Softail Models Standard, Custom, Night Train, Deuce, Springer, Heritage, Fatboy, Deluxe, Rocker and Cross Bones.
Sponsored by:
Sponsored by:

Break In

Thread Tools
 
Search this Thread
 
  #11  
Old 06-10-2005, 10:48 PM
monkyman's Avatar
monkyman
monkyman is offline
Outstanding HDF Member
Join Date: Feb 2005
Location:
Posts: 2,925
Likes: 0
Received 5 Likes on 5 Posts
Default RE: Break In


Hey Monkeyman,

Your sig pic looks very familiar, hehehhe... great minds, eh?
Yeah, it's a good angle for the bike!
Rock on, Dude!
 
  #12  
Old 06-11-2005, 01:08 AM
Wolf's Avatar
Wolf
Wolf is offline
Road Captain
Join Date: Jan 2005
Location:
Posts: 518
Likes: 0
Received 1 Like on 1 Post
Default RE: Break In

Read the owner's manual, do what it says for the first 500 miles, go easy on it the next 500 miles then run the hell out of it. That's what I did, then at around 4500 miles something happened and it definitely picked up a few seat of the pants HP and has never used a drop of oil in 7000 miles so far. Mine runs great with the Stage I since new and the Vance Hines Staggered Big Shots. I'm also cool now, LOL!
 
  #13  
Old 06-13-2005, 12:17 PM
HDF Tech's Avatar
HDF Tech
HDF Tech is offline
Banned
Join Date: May 2005
Location:
Posts: 14,498
Likes: 0
Received 152 Likes on 43 Posts
Default RE: Break In

Hastings Manufacturing
325 North Hanover Street.
Hastings, Michigan 49058-1598 USA
Phone (269) 945-2491 Fax (269) 945-4667


BREAK-IN PROCEDURE

STARTING PROCEDURE
1. Set tappets, adjust carburetor and ignition timing as accurately as possible before starting engine.

2. Start engine and set throttle to an engine speed of approximately 25 miles per hour (trucks, tractors and stationary engines one-third throttle) until the engine coolant reaches normal operating temperature. Then shut down engine and retorque cylinder head bolts, recheck carburetor adjustments, ignition timing and valve tappet clearance. (Run engine at fast idle during warm-up period to assure adequate initial lubrication for piston rings, pistons and cylinders.)

BREAK-IN PROCEDURE

1. Make a test run at 30 miles per hour and accelerate at full throttle to 50 miles per hour. Repeat the acceleration cycle from 30 to 50 miles per hour at least ten times. No further break-in is necessary. If traffic conditions will not permit this procedure, accelerate the engine rapidly several times through the intermediate gears during the check run. The object is to apply a load to the engine for short periods of time and in rapid succession soon after engine warm up. This action thrusts the piston rings against the cylinder wall with increased pressure and results in accelerated ring seating.

2. Following the breaking-in, turn the vehicle over to the owner or operator with the following suggestions:

PASSENGER CAR AND LIGHT TRUCK
Drive vehicle normally but avoid sustained high speed during the first 100 miles.

HEAVY DUTY TRUCKS AND BUSES
If possible, place in light duty for first 50 miles. At no time should the engine be lugged. Lugging is said to exist when the engine does not respond to further depression of the accelerator.

FARM TRACTORS
Operate at one-half load or less for the first two hours.


(P33)


 
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
vtxkc
Touring Models
32
01-27-2010 09:30 PM
JohnB445
Touring Models
7
04-06-2008 08:53 PM
Windup08
Touring Models
14
09-27-2007 02:11 PM
Phins74
General Harley Davidson Chat
3
04-05-2007 10:33 PM
boogerbooger
Dyna Glide Models
16
12-24-2006 09:17 PM



Quick Reply: Break In



All times are GMT -5. The time now is 05:24 PM.